본문으로 바로가기
Ess-neofab

A line- and system-level record of ESS and secondary-battery manufacturing processes

  • 한국어
  • English
  • Home
  • Process
  • System
  • Interface
  • Traceability
  • News & Trends
  • About
  • Contact
  • 한국어
  • English
  • Home
  • Process
  • System
  • Interface
  • Traceability
  • News & Trends
  • About
  • Contact

카테고리

  • Interface (30)
  • News & Trends (20)
  • Process (34)
  • System (31)
  • Traceability (22)

최근 글

  • Cells shipped on time, yet LGES ESS revenue hit only 94 % of planOctober 29, 2026
  • Samsung SDI’s third US LFP line: CT orders fell 10.3 %October 22, 2026
  • Five million ACC cells equal 2.7 to 3.6 months of nameplate outputOctober 15, 2026
  • A 160 MW battery’s six-week commissioning has two baselinesOctober 8, 2026
  • Two Cycles a Day Take 106.8 % of a Day, and the Retention Tier Shifts Cell Volume by 1.47 GWhOctober 1, 2026
  • Battwoo’s Second-Life EV Batteries — When an 80 % Acceptance Threshold Overlaps the Retirement Distribution, Incoming Screening Becomes the BottleneckSeptember 30, 2026
  • Featured image showing a narrowing pipe for the pack bottleneck that held Q2 ESS revenue to 94.0 % of plan
    Interface,  Process

    Cells shipped on time, yet LGES ESS revenue hit only 94 % of plan

    October 29, 2026 /

    In the second quarter of 2026, LG Energy Solution's North American storage business made cells without trouble, yet pack and container capacity became the bottleneck, and broker figures put ESS revenue growth at +31.6 % against company guidance of +40 %. That is 94.0 % of plan, and the missing 6.0 % equals roughly 5.5 days of shipments out of a 91-day quarter. My calculation shows that clearing this backlog in Q3 on top of the plan would take +55.4 % quarter on quarter, and a broker analysis reported on 27 October puts Q3 ESS revenue growth at close to 60 %. Taken together, the two quarters land within ±2…

    read more
    ESS-neofab 0 Comments

    You May Also Like

    ESS 조립라인 침지냉각 병목과 병렬화 후 처리간격을 비교한 인포그래픽

    ESS Assembly Line: Why Immersion Cooling Becomes a Bottleneck

    August 20, 2026
    스테이션 블록 대형화 시 현장 시운전 공수를 유닛 개수 비례 약 20%와 셀·에너지 비례 약 80%로 분해한 비교 도식

    When the Station Block Grows to 62 MWh, What Actually Shrinks Is Commissioning Labor, Not Cell Count

    September 17, 2026
    대형 LFP 셀 314 Ah와 601 Ah의 100 MWh급 ESS 스트링 정지 건수와 에너지 가중 비가용률 비교 도식

    Pylontech’s 588 Ah and 601 Ah LFP Cells Enter Mass Production — Why Energy-Weighted Availability Stays the Same When the Cell Count Halves

    September 28, 2026
© 2026 Ess-neofab · A line- and system-level record of ESS and secondary-battery manufacturing processes
  • About
  • Contact
  • Privacy Policy
  • Disclaimer
Ashe Theme by WP Royal.