  • Cells shipped on time, yet LGES ESS revenue hit only 94 % of planOctober 29, 2026
  • Samsung SDI’s third US LFP line: CT orders fell 10.3 %October 22, 2026
  • Five million ACC cells equal 2.7 to 3.6 months of nameplate outputOctober 15, 2026
  • A 160 MW battery’s six-week commissioning has two baselinesOctober 8, 2026
  • Two Cycles a Day Take 106.8 % of a Day, and the Retention Tier Shifts Cell Volume by 1.47 GWhOctober 1, 2026
  • Battwoo’s Second-Life EV Batteries — When an 80 % Acceptance Threshold Overlaps the Retirement Distribution, Incoming Screening Becomes the BottleneckSeptember 30, 2026
  • Featured image showing the 10.3 % lower CT inspection order for Samsung SDI's third US LFP line
    Interface,  Process

    Samsung SDI’s third US LFP line: CT orders fell 10.3 %

    October 22, 2026 /

    On 21 October 2026, Korean trade press reported two new equipment orders for the third LFP line for energy storage at Samsung SDI's joint-venture plant in Indiana. In the same plant, the CT inspection order for that line came in 10.3 % below the first line's order, while the assembly equipment order that covers stacking came in 20.9 % above the second line's. When the cell grows from the 273 Ah class to the 300 Ah class, a step that handles one cell at a time needs about 9.0 % less equipment, which sits within 1.3 percentage points of the CT drop. Cell size does not explain the assembly increase,…

    read more
    ESS-neofab 0 Comments

    You May Also Like

    포항 LFP 양극재 출하에서 조지아 ESS 셀 라인 입고까지 45일 리드타임과 안전재고 1,138 t를 나타낸 인터페이스 도식

    45 Days from Pohang to Georgia — Safety Stock at an Intercontinental Cathode Interface Is Driven by Lead-Time Variability, Not Demand

    September 23, 2026
    ESS 계통접속 대기열 버퍼-인터페이스-택타임 개념도

    Re-Reading the ESS Grid-Interconnection Queue in the Language of Line Balancing

    August 25, 2026
    레이저 노칭 헤드 사이클타임 1.20초와 라인 택타임 0.95초를 비교해 필요 헤드 수 2대를 도출한 도식

    The Interface Between Laser Notching Cycle Time and Line Takt Time — The Head-Count Sizing Problem Revealed by DI ENT’s Ohio Supply Contract

    September 7, 2026