  • Five million ACC cells equal 2.7 to 3.6 months of nameplate outputOctober 15, 2026
  • A 160 MW battery’s six-week commissioning has two baselinesOctober 8, 2026
  • Two Cycles a Day Take 106.8 % of a Day, and the Retention Tier Shifts Cell Volume by 1.47 GWhOctober 1, 2026
  • Battwoo’s Second-Life EV Batteries — When an 80 % Acceptance Threshold Overlaps the Retirement Distribution, Incoming Screening Becomes the BottleneckSeptember 30, 2026
  • US storage set an energy record in Q2 as installed power fell 7%September 29, 2026
  • CATL Starts Trial Production in Debrecen — The Digits of the Defect-Rate Target, Not the Equipment, Set the Length of a Trial RunSeptember 29, 2026
  • 고체전해질 연속공정과 조립라인 사이 버퍼재고 인터페이스 다이어그램
    Interface,  Process

    Between the Continuous Solid-Electrolyte Process and the Assembly Line: How Should the Buffer Interface Be Designed?

    August 31, 2026 /

    CIS's continuous-process pilot line for sulfide-based solid electrolyte at its Daegu Plant 3 (2–5 t/year, expanded from the existing batch process's 840 kg) and M Plus's order for six types of all-solid-state battery assembly equipment (targeting development/fabrication completion by end-2026) reveal a textbook interface problem: the production capacities of the upstream materials process and the downstream assembly process are not scaled up on the same timeline. This article estimates, as an assumed scenario, the buffer stock and takt-time loss required between these two processes, to quantitatively pin down why the materials-assembly interface design is a leading variable for the line's overall OEE (Overall Equipment Effectiveness). The downstream assembly equipment's target…

    read more
    ESS-neofab 1 Comment

    You May Also Like

    비전 시스템 도입 리드타임 막대 도식 — 모델 단계만 축소될 때 전체가 77.5 %로만 줄어드는 구조

    Even a tenfold faster model moves the whole by 1.29x — what “5 to 10 times faster commissioning” actually requires

    September 26, 2026
    엣지 AI 비전검사 인터페이스 3안 비교: 엣지 로컬 판정, 게이트웨이 집선, 클라우드 중앙집중의 응답시간과 Traceability 완전성 비교 도식

    Edge AI Vision Inspection and Battery-Pack Leak Testing: How Gateway Aggregation Affects Traceability Completeness

    August 27, 2026
    ESS 계통접속 대기열 버퍼-인터페이스-택타임 개념도

    Re-Reading the ESS Grid-Interconnection Queue in the Language of Line Balancing

    August 25, 2026