  • Five million ACC cells equal 2.7 to 3.6 months of nameplate outputOctober 15, 2026
  • A 160 MW battery’s six-week commissioning has two baselinesOctober 8, 2026
  • Two Cycles a Day Take 106.8 % of a Day, and the Retention Tier Shifts Cell Volume by 1.47 GWhOctober 1, 2026
  • Battwoo’s Second-Life EV Batteries — When an 80 % Acceptance Threshold Overlaps the Retirement Distribution, Incoming Screening Becomes the BottleneckSeptember 30, 2026
  • US storage set an energy record in Q2 as installed power fell 7%September 29, 2026
  • CATL Starts Trial Production in Debrecen — The Digits of the Defect-Rate Target, Not the Equipment, Set the Length of a Trial RunSeptember 29, 2026
  • 포항 LFP 양극재 출하에서 조지아 ESS 셀 라인 입고까지 45일 리드타임과 안전재고 1,138 t를 나타낸 인터페이스 도식
    Interface,  Process

    45 Days from Pohang to Georgia — Safety Stock at an Intercontinental Cathode Interface Is Driven by Lead-Time Variability, Not Demand

    September 23, 2026 /

    SK On’s roughly KRW 1.0742 trillion LFP cathode contract with POSCO Future M (2027–2029, for its Georgia ESS cell line) puts a continent and an ocean crossing between the materials and cell plants. Under an assumed scenario (45-day lead time, σL 7 days, 98.1 t/day), safety stock in front of the Georgia cell line is about 1,138 t, 99.1% of which comes from the lead-time variability term. Halving lead-time variability cuts it to 577 t; halving demand variability leaves it at 1,136 t. At an intercontinental interface, the management variable is the spread of arrival times, not the demand forecast.

    read more
    ESS-neofab 3 Comments

    You May Also Like

    Isometric concept linking FAT and FIT at the vendor's facility with SAT, SIT, the performance test and acceptance of plant on site

    FAT and SAT Differ in More Than Location — How IEC 62381:2024 Defines the Tests

    September 25, 2026
    ESS 계통접속 대기열 버퍼-인터페이스-택타임 개념도

    Re-Reading the ESS Grid-Interconnection Queue in the Language of Line Balancing

    August 25, 2026
    팩 조립 라인과 컨테이너 셸 제작 라인이 합류점 버퍼에서 만나 통합 스테이션으로 이어지는 10 GWh BESS 라인 도식, AGV 4대 산정

    Designing the Merge Point in a 10 GWh Pack-Container Integration Line: Synchronizing Two Upstream Lines and Sizing AGV Fleet from the Powertrac × Sunka Lead Order

    September 10, 2026