본문으로 바로가기
Ess-neofab

A line- and system-level record of ESS and secondary-battery manufacturing processes

  • 한국어
  • English
  • Home
  • Process
  • System
  • Interface
  • Traceability
  • News & Trends
  • About
  • Contact
  • 한국어
  • English
  • Home
  • Process
  • System
  • Interface
  • Traceability
  • News & Trends
  • About
  • Contact

카테고리

  • Interface (28)
  • News & Trends (20)
  • Process (32)
  • System (31)
  • Traceability (22)

최근 글

  • Five million ACC cells equal 2.7 to 3.6 months of nameplate outputOctober 15, 2026
  • A 160 MW battery’s six-week commissioning has two baselinesOctober 8, 2026
  • Two Cycles a Day Take 106.8 % of a Day, and the Retention Tier Shifts Cell Volume by 1.47 GWhOctober 1, 2026
  • Battwoo’s Second-Life EV Batteries — When an 80 % Acceptance Threshold Overlaps the Retirement Distribution, Incoming Screening Becomes the BottleneckSeptember 30, 2026
  • US storage set an energy record in Q2 as installed power fell 7%September 29, 2026
  • CATL Starts Trial Production in Debrecen — The Digits of the Defect-Rate Target, Not the Equipment, Set the Length of a Trial RunSeptember 29, 2026
  • Isometric concept of a line with products moving between stations at equal intervals, labeled takt time, cycle time and lead time
    Interface,  Process

    Don’t Subtract Breakdowns When Calculating Takt Time — Takt Time vs. Cycle Time vs. Lead Time

    September 25, 2026 /

    Takt time is the target production interval obtained by dividing available working time by customer demand, whereas cycle time is the measured time a process actually takes to make one unit. The calculation rule in the workbook published by the Lean Enterprise Institute (LEI) subtracts from shift time planned operator breaks, meetings, cleanups, etc., but not time for unplanned machine downtime, changeovers or other internal problems. Dividing the 27,600 s of available working time per shift obtained under this rule by the demand per shift of 690 units gives a takt time of 40 s. To cover stopped time as well, the measured cycle time must be shorter than takt…

    read more
    ESS-neofab 5 Comments

    You May Also Like

    배전망 ESS 1차 사업 128MW 물량이 삼성SDI 66%와 나머지 3사 34%로 배분되는 구조를 보여주는 비교 다이어그램

    128 MW of Distribution-Grid ESS Volume Allocated — Can the Battery Pack Assembly Line Absorb the Takt Time?

    September 4, 2026
    Isometric concept linking FAT and FIT at the vendor's facility with SAT, SIT, the performance test and acceptance of plant on site

    FAT and SAT Differ in More Than Location — How IEC 62381:2024 Defines the Tests

    September 25, 2026
    ESS 계통접속 대기열 버퍼-인터페이스-택타임 개념도

    Re-Reading the ESS Grid-Interconnection Queue in the Language of Line Balancing

    August 25, 2026
  • 레이저 노칭 헤드 사이클타임 1.20초와 라인 택타임 0.95초를 비교해 필요 헤드 수 2대를 도출한 도식
    Interface,  Process

    The Interface Between Laser Notching Cycle Time and Line Takt Time — The Head-Count Sizing Problem Revealed by DI ENT’s Ohio Supply Contract

    September 7, 2026 /

    DI ENT signed laser notching equipment supply contracts worth a combined KRW 87.3 billion, across two separate orders, with LH Battery Company (an LG Energy Solution–Honda joint venture), for delivery to Honda’s new second battery plant in Ohio, USA, by March 2026. This supply contract is more than an order-win announcement — it surfaces an interface-design problem between the notching process’s cycle time and the line’s takt time. When the processing time of a single notching head is longer than the takt time the line requires, adding parallel heads becomes unavoidable, and as burr-width specifications are tightened, per-head processing time increases, causing the required head count to rise non-linearly. This…

    read more
    ESS-neofab 1 Comment

    You May Also Like

    Hero graphic showing five million cells equal 2.7 to 3.6 months of a 12-month nameplate year bar

    Five million ACC cells equal 2.7 to 3.6 months of nameplate output

    October 15, 2026
    Isometric concept linking FAT and FIT at the vendor's facility with SAT, SIT, the performance test and acceptance of plant on site

    FAT and SAT Differ in More Than Location — How IEC 62381:2024 Defines the Tests

    September 25, 2026
    비전 시스템 도입 리드타임 막대 도식 — 모델 단계만 축소될 때 전체가 77.5 %로만 줄어드는 구조

    Even a tenfold faster model moves the whole by 1.29x — what “5 to 10 times faster commissioning” actually requires

    September 26, 2026
© 2026 Ess-neofab · A line- and system-level record of ESS and secondary-battery manufacturing processes
  • About
  • Contact
  • Privacy Policy
  • Disclaimer
Ashe Theme by WP Royal.