본문으로 바로가기
Ess-neofab

A line- and system-level record of ESS and secondary-battery manufacturing processes

  • 한국어
  • English
  • Home
  • Process
  • System
  • Interface
  • Traceability
  • News & Trends
  • About
  • Contact
  • 한국어
  • English
  • Home
  • Process
  • System
  • Interface
  • Traceability
  • News & Trends
  • About
  • Contact

카테고리

  • Interface (28)
  • News & Trends (20)
  • Process (32)
  • System (31)
  • Traceability (22)

최근 글

  • Five million ACC cells equal 2.7 to 3.6 months of nameplate outputOctober 15, 2026
  • A 160 MW battery’s six-week commissioning has two baselinesOctober 8, 2026
  • Two Cycles a Day Take 106.8 % of a Day, and the Retention Tier Shifts Cell Volume by 1.47 GWhOctober 1, 2026
  • Battwoo’s Second-Life EV Batteries — When an 80 % Acceptance Threshold Overlaps the Retirement Distribution, Incoming Screening Becomes the BottleneckSeptember 30, 2026
  • US storage set an energy record in Q2 as installed power fell 7%September 29, 2026
  • CATL Starts Trial Production in Debrecen — The Digits of the Defect-Rate Target, Not the Equipment, Set the Length of a Trial RunSeptember 29, 2026
  • 대형 LFP 셀 314 Ah와 601 Ah의 100 MWh급 ESS 스트링 정지 건수와 에너지 가중 비가용률 비교 도식
    Interface,  System

    Pylontech’s 588 Ah and 601 Ah LFP Cells Enter Mass Production — Why Energy-Weighted Availability Stays the Same When the Cell Count Halves

    September 28, 2026 /

    On September 21, 2026, Pylontech began mass production of 588 Ah and 601 Ah prismatic LFP ESS cells at its Hefei base and named "fewer cells and interconnections" as a benefit of the larger format¹. Under a reverse-engineered assumption of 416S strings, a 100 MWh-class site drops from 99,840 cells to 52,000 cells (−47.9 %), and string trips caused by cell-count-proportional faults fall at the same rate. Each trip, however, now removes 800.1 kWh instead of 418.0 kWh (1.91×), so the energy-weighted unavailability stays at 0.0285 % regardless of cell capacity. The mean is unchanged and only the tail gets heavier: the probability of losing 0.8 % or more of…

    read more
    ESS-neofab 0 Comments

    You May Also Like

    Two baselines on a six-week commissioning: 3.00x against 18 weeks, 4.17x against 25 weeks

    A 160 MW battery’s six-week commissioning has two baselines

    October 8, 2026
    고체전해질 연속공정과 조립라인 사이 버퍼재고 인터페이스 다이어그램

    Between the Continuous Solid-Electrolyte Process and the Assembly Line: How Should the Buffer Interface Be Designed?

    August 31, 2026
    삼성SDI 스타플러스에너지 인디애나 공장의 NCA·LFP 라인 순차 커미셔닝 일정과 혼합 OEE 개념도

    StarPlus Energy’s Indiana Plant — The Blended-OEE Illusion Created by Sequential NCA/LFP Commissioning

    September 9, 2026
  • 삼성SDI 스타플러스에너지 인디애나 공장의 NCA·LFP 라인 순차 커미셔닝 일정과 혼합 OEE 개념도
    Interface,  System

    StarPlus Energy’s Indiana Plant — The Blended-OEE Illusion Created by Sequential NCA/LFP Commissioning

    September 9, 2026 /

    The Samsung SDI–Stellantis joint venture StarPlus Energy's Indiana (Kokomo) plant is bringing four lines online in sequence over 18 months: an NCA line starting October 2025, an LFP line (12 GWh/year) in Q4 2026, and additional NCA and LFP lines in Q1 2027. When lines of different chemistries (NCA, LFP) and end uses (EV, ESS) are commissioned at different times within a single site, a “Blended OEE” that sums the entire site into one number creates an illusion that obscures the actual performance of mature lines. This article back-calculates Takt Time from the publicly disclosed line-startup schedule and compares site-level blended metrics against line-level OEE under an assumed scenario. The…

    read more
    ESS-neofab 1 Comment

    You May Also Like

    셀 조립 택타임 8.79s와 화성 체류 72h로 역산한 필요 화성 채널 약 29,500개를 비교한 라인 인터페이스 도식(가정 시나리오)

    Formation Channel Sizing Read from a Cell Assembly Equipment FAT — How 1 Second of Takt Time Moves 3,350 Channels

    September 6, 2026
    계통관리변전소와 장주기 ESS EMS-PCS-BMS 인터페이스 응동 목표 도식

    Long-Duration ESS Interface Design in the Era of Power-Grid Saturation

    August 22, 2026
    레이저 노칭 헤드 사이클타임 1.20초와 라인 택타임 0.95초를 비교해 필요 헤드 수 2대를 도출한 도식

    The Interface Between Laser Notching Cycle Time and Line Takt Time — The Head-Count Sizing Problem Revealed by DI ENT’s Ohio Supply Contract

    September 7, 2026
  • SK온 ESS 이원화 생산기지 비교 — 조지아 공장 고정계약 9GWh와 서산 2공장 변동입찰 3GWh의 가정 택타임
    Interface,  System

    SK On’s Dual-Site ESS Production Bases — Where Fixed Contracts and Variable Bidding Split Takt Time Design

    September 3, 2026 /

    As of the second half of 2026, SK On is simultaneously pursuing two capacity-allocation efforts that look similar on the surface but differ sharply in character: a long-term fixed-contract ESS supply obligation from its Georgia, USA plant (9 GWh over 2027-2031 to NeoVolta Power), and a variable-bid-responsive capacity build at its domestic Seosan Plant 2, where 2 of 4 production lines are being converted to dedicated ESS-LFP pouch-cell lines. Both sites represent "ESS expansion" on paper, but the takt time (Takt Time) character each demands is different. Using publicly disclosed contract and conversion volumes, this article constructs an assumed scenario showing quantitatively that the fixed-contract site is better served by…

    read more
    ESS-neofab 0 Comments

    You May Also Like

    삼성SDI 스타플러스에너지 인디애나 공장의 NCA·LFP 라인 순차 커미셔닝 일정과 혼합 OEE 개념도

    StarPlus Energy’s Indiana Plant — The Blended-OEE Illusion Created by Sequential NCA/LFP Commissioning

    September 9, 2026
    Isometric concept of a line with products moving between stations at equal intervals, labeled takt time, cycle time and lead time

    Don’t Subtract Breakdowns When Calculating Takt Time — Takt Time vs. Cycle Time vs. Lead Time

    September 25, 2026
    ESS 조립라인 침지냉각 병목과 병렬화 후 처리간격을 비교한 인포그래픽

    ESS Assembly Line: Why Immersion Cooling Becomes a Bottleneck

    August 20, 2026